Project Value:

£17.2m

Services Provided:

Project Management; Engineering design and Site supervision

  • The runway at Jersey Airport was last resurfaced in 1990 with Porous Friction Course (PFC). The PFC surface reached the end of its design life and needed to be replaced to ensure it met friction and drainage compliance requirements.

  • The Design Team prepared a design and specification for the Works on the basis of improving the overall runway geometric compliance towards Code 4C.

  • The primary challenge to the scheme was to safeguard the operation of Jersey Airport during the works, especially in the context of the daily hand back of the runway at the end of each night shift to allow safe operational use of the runway by aircraft.

  • The runway was completed in June 2009 to ensure the operation of the airport was not compromised during the busy summer holiday period.

For further information on this project please contact David Mason

Tel: 01534 752754
Email: davidmason@ipm.je

Live chat

Please enter your email, name and a message. We will get back to you as soon as we can

Name


Email Address

Message

Send Message

Sending

Live chat sent

Failed to send live chat

Please reload the page and try again